About Us

The company KSB, konstrukce, stroje, brusy, spol. s r.o. was founded by four partners in November 1992. The original production programme focused on small-scale metal fabrication, the manufacture of smaller stone-working machines, and the sale of abrasive materials.

About Us

From 1993 onwards, the production programme gradually evolved. Individual projects became focused on the manufacture of interior metal elements, stainless steel and brass railings, and staircases. At the same time, production of stainless steel components for industry, healthcare, and agriculture was launched.

The growing number of contracts led to the rental of additional production facilities and a gradual increase in the number of employees. As the rented premises no longer met the requirements of increasingly complex production, construction of a new manufacturing facility was initiated in 1998.

In 2003, the quality management system ČSN EN ISO 9001:2001 was implemented for the production of railings, staircases, handrails, and cooling tunnels.

In 2005, an additional part of the production facilities was added. In the following years, production capacities and machinery were further expanded:

2008 – blasting cabin
2012 – new press brake
2014 – water jet cutting
2018 – laser cutting

In 2021, the blasting cabin was refurbished and enlarged, enabling us to shot-blast larger structures.

A major expansion of our production capacity took place in 2022. We invested in new machinery, including a 320-tonne press brake with a 4-metre bending length, a machine for manufacturing screw conveyor flights, and a 5-tonne forklift.

We also acquired a new 2,000 m² production facility across the street, where we established a modern welding workshop. Since mid-2023, two 5-tonne overhead cranes have enabled us to manufacture large welded structures.

In 2025, we continued to expand our production capacity. A new assembly hall equipped with a 5-tonne overhead crane was built at our new facility.

In 2025, we also completed the project Construction of a Photovoltaic Power Plant with Battery Storage, co-financed by the European Union. The project included the installation of a 50 kWp photovoltaic power plant with a 100 kWh battery storage system at our new facility. This investment is expected to cover approximately 80% of the facility's electricity consumption. PROJECT

At the end of 2025, we successfully acquired additional production premises, where we plan to further expand our machining capabilities.

Today, we primarily focus on advanced stainless steel manufacturing for industry, energy, food processing, healthcare, and construction. Our team consists of approximately 35 experienced and qualified employees, including our own in-house engineering and design department.